Project Conditions
Coordinated support for demanding drilling programs.
Some programs bring difficult access, complex ground, strict safety requirements, tight production windows, technical uncertainty, or multiple drilling methods across regions.
Boart Longyear brings the planning, crews, equipment, and field support needed to manage those demands as one coordinated program.
Complex ground conditions
Ground conditions are uncertain, variable, or difficult to predict.
Safety-sensitive work
The work takes place in active operations or environments with strict safety controls.
Multi-method programs
The project may require more than one drilling method or technical approach.
High consequence execution
Delays, rework, poor recovery, or inconsistent execution can affect production, schedules, and critical project decisions.
How We Operate
Execution starts before the rig is mobilized.
Reliable drilling performance starts with how the work is planned, staffed, equipped, and controlled before the first shift begins.
-
Understand the project conditions
Review the operating environment, ground conditions, access, safety requirements, schedule, and project objectives.
-
Select the right method and equipment
Match the drilling method, rig, tooling, support equipment, and crew requirements to the work.
-
Mobilize crews and support systems
Align crews, equipment, maintenance, safety systems, logistics, and regional support before work begins.
-
Execute with safety and operational discipline
Carry the plan into the field through supervision, communication, hazard controls, and consistent work practices.
-
Capture outcomes and field learning
Use project results, field observations, safety learning, and performance data to strengthen future planning and execution.
What Reduces Risk
Experience across methods, regions, and operating conditions
Ground conditions, access, schedules, and production demands can change quickly. Boart Longyear brings experienced crews, structured planning, and field judgment to support safe, controlled execution as conditions change.
Safety / ESG / Discipline
Operational discipline starts with safety.
Safety is part of how complex drilling work is planned, supervised, and executed. Boart Longyear’s approach includes field-based risk assessment, hazard recognition, pre-shift preparation, experienced supervision, incident learning, and consistent operating procedures.
Environmental, water, community, and compliance requirements are addressed through the same disciplined approach—aligned to the site, the region, and the work being performed.
Safety systems and field controls
Risk controls built into planning and daily execution.
Risk assessment and pre-shift discipline
Hazards, controls, and responsibilities reviewed before work starts.
Experienced supervision
Field leaders who understand the work, the conditions, and the decisions required on site.
Environmental and community responsibility
Environmental and community requirements addressed through planning, communication, and site-specific controls.
Consistent operating procedures
Work supported by established procedures, training, and supervision.
Project Experience
Experience applied to complex drilling programs.
Explore projects that show how Boart Longyear teams bring together methods, equipment, safety systems, and field support to meet specific technical and operating requirements.
Winter Coring in Canada
- Region
- Canada
- Challenge
- Complete a winter coring program across two mine sites while meeting a minimum 90% core recovery requirement.
- Boart Longyear approach
- Our experienced crews coordinated a five-rig program to complete 218 holes through demanding winter conditions.
- Outcome / proof point
- 98.39% average core recovery, zero re-drills, and zero injuries across approximately 18,000 m of drilling.
- Related capability
- Surface Coring
Deep Sonic Sampling
- Region
- USA
- Challenge
- Recover continuous samples through unconsolidated waste rock where bedrock depth was unknown.
- Boart Longyear approach
- Our sonic crews adjusted borehole and casing sizes in stages, continuing beyond the original 700 ft target.
- Outcome / proof point
- Reached 900 ft with 100% in-situ core samples and less than 1% hole deviation.
- Related capability
- Sonic Drilling
Mine Water-Well Drilling
- Region
- Australia
- Challenge
- Complete large-diameter mine water wells through fractured ground while controlling circulation loss and discharge water.
- Boart Longyear approach
- Our crews used dual-tube flooded reverse circulation drilling with a closed-loop system to maintain circulation and minimize discharge.
- Outcome / proof point
- Completed wells to 250 m, with less than 1% deviation on a documented 144 m well and no circulation-loss stoppages.
- Related capability
- Dewatering / Water Production Drilling