Case Studies

See how Longyear performs across projects and applications.

Explore case studies showing how Longyear teams align methods, crews, equipment, and planning to project requirements and the results achieved.

Browse Case Studies

Find projects relevant to your work.

Browse by service, region, or application, or search by keyword.

Clear filters

All Case Studies

Case study library

Browse project examples across drilling methods, regions, applications, and operating conditions.

Observable operating result pending final client approval.

Dewatering program maintains operating continuity

A coordinated dewatering and pump-support program addressed site water constraints while maintaining access and operating continuity.

  • Dewatering
  • Pump Services
  • Canada
  • Production
  • Water / Dewatering
View Case Study

274.32 meters reached with less than 1% hole deviation.

Sonic drilling reaches depth with less than 1% deviation

Sonic drilling was applied where depth, alignment, and sample continuity were central to the project objective.

  • Sonic Drilling
  • USA
  • Exploration
View Case Study
Drilling project in operation

Completed within the required noise threshold, with no recordable downtime or emissions violation.

Electric rotary drilling meets strict municipal noise requirements

An electric rotary configuration supported municipal water-well work where noise, emissions, and the surrounding operating environment shaped equipment selection.

  • Rotary Drilling
  • Water Supply Drilling
  • Canada
  • Infrastructure
  • Water / Dewatering
View Case Study

2,300 meters drilled; wells completed to 250 meters; less than 1% hole deviation.

Dual-tube flooded reverse drilling supports mine water wells

Longyear used dual-tube flooded reverse drilling for mine water wells in the Pilbara, where ground conditions, discharge management, and active operations shaped the drilling plan.

  • Dewatering
  • Dual-Tube Flooded Reverse
  • Water Supply Drilling
  • Australia
  • Mine Water Wells
  • Water / Dewatering
View Case Study
Drilling project in operation

656 meters drilled in 39 shifts, intersecting within 2.1 meters of target.

Directional drilling reaches a paste-fill target in a single pass

Longyear completed a large-diameter paste-fill hole where borehole accuracy, casing requirements, and single-pass delivery were central to the program.

  • Directional Drilling
  • Rotary Drilling
  • Australia
  • Mine Development
  • Paste Fill
View Case Study
Drilling project in operation

6,100 ounces of gold extracted in the first 17 months.

Sonic sampling and well installation on a heap leach pad

Longyear used Sonic drilling to collect samples and install solution-enhancement wells on a Nevada heap leach pad. The work helped identify dry zones and inform leach-pad interventions.

  • Sonic Drilling
  • USA
  • Heap Leach Pad
View Case Study

Related Capabilities

Explore the capabilities behind the work.

See which drilling methods, field systems, and support services were applied in each project, and where those capabilities may be relevant to your own operating conditions.

Surface & Exploration

Surface coring, reverse circulation, rotary drilling, and related exploration applications.

Explore Capability

Underground

Underground coring, production drilling, grade control, and work in active mine environments.

Explore Capability

Advanced Methods

Sonic, directional drilling, and specialized technical applications.

Explore Capability

Water & Support Services

Dewatering, water supply drilling, pump services, and field water management.

Explore Capability

Project Inquiries

Looking for project experience relevant to your work?

Share the project location, drilling objective, operating conditions, timeline, and tender requirements. Longyear will route the inquiry to the appropriate regional and technical team.